Telecom Installation PlanningTelecom basic Telecom Engineering.

Telecom Installation PlanningTelecom basic Telecom Engineering.

HomeTelecommunications Training portalTelecom Installation PlanningTelecom basic Telecom Engineering.
Telecom Installation PlanningTelecom basic Telecom Engineering.
ChannelPublish DateThumbnail & View CountDownload Video
Channel AvatarPublish Date not found Thumbnail
0 Views
Telecom installation first includes the layout, the criteria are very easy to understand. First of all, a field telecommunications engineer will check the layout plan and verify the antenna height, azimuth, existing technologies and guide his teammates that during installation, you need to verify the following data on the tower top. Red handwriting indicates that new technologies will be proposed according to the layout plan. The red dotted line indicates the connection of the bond wires to RRU and RF antenna. Cascading fibers must also be checked from the layout plan and fiber optics must be installed from end to end. As a field telecom engineer, it is your responsibility to guide your teammates during this activity.

#Telecom installer
#Telecomlayout
#RFlayoutplan.

Subscribe to the telecommunications training portals and stay up to date with our latest videos

Our intention is not to reduce the views of the original content, but my goal is to educate people through my technical videos.

Copyright Disclaimer: Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for /"fair use/" for purposes such as criticism, comment, news reporting, teaching, scholarship and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.

Please take the opportunity to connect and share this video with your friends and family if you find it helpful.